True HQ 4K HDMI Cable 15m, High Speed 18Gbps (HDMI 2.0), 4K60Hz Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet ? Long Lead for TV, Projector,
Sale!

True HQ 4K HDMI Cable 15m, High Speed 18Gbps (HDMI 2.0), 4K60Hz Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet ? Long Lead for TV, Projector,

Original price was: £30.11.Current price is: £9.03.

SKU: 15348824408441 Category:

Description

True HQ 4K HDMI Cable 15m, High Speed 18Gbps (HDMI 2.0), 4K@60Hz Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet – Long Lead for TV, Projector, Monitor, PS5, Xbox

Reviews

There are no reviews yet.

Be the first to review “True HQ 4K HDMI Cable 15m, High Speed 18Gbps (HDMI 2.0), 4K60Hz Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet ? Long Lead for TV, Projector,”

Your email address will not be published. Required fields are marked *